Show/Hide
Skip to page body Home About The City Government Departments and Services Visiting Living Doing Business How Do I..?

Street curb & gutter workers

The Street Department maintains the infrastructure of city streets, signs, pavement markings, sidewalks, curb and gutter, storm drainage pipes and structures, and provides ice and snow control on streets located within the city limits. The department provides 24/7 emergency services to ensure safe and reliable roadways. The department is responsible for 125 miles of roads, 47 miles of sidewalk and 124 miles of curb and gutter within the city limits. Additionally, the department coordinates with NCDOT to ensure State maintained thoroughfares totaling 37 miles throughout Lexington remain in good repair.

Street patching workersThe department consists of 4 crews: Asphalt, Sign/Markings, Concrete and Construction. Street sweeping/flushing is performed on city streets and city owned property. The City increases productivity by cross training members of the crews to assist as necessary, while maintaining the specialized skills needed to accomplish the various tasks required of the street maintenance department. 

Public Services Manager Roger Jones oversees this area of responsibility.

 

Street Department "Infrastructure First" logo

News
  • Feb 14
    Fire Hydrants Replaced on Queens Road

    City crews have completed work to replace two leaking fire hydrants, which required water interruption on Thursday, February 15th.

  • Jan 30
    Utility Billing System Upgrade Underway

    Lexington Utilities billing system upgrade is underway. The two week long process may mean you may experience a wait time. We want to thank you ahead of time for your patience!

  • Dec 21
    The Fire at Dixie Furniture (LFI Plant 1)

    The dust is beginning to settle from one of the largest fires in Lexington history. Crews continue to monitor the mounds of brick and twisted metal that once was Dixie Furniture.

  • Jan 22
    Natural Gas Main Replacement Project

    Lexington Utilities is beginning a project to upgrade natural gas lines along Fairview Drive between Talbert Blvd. and Cotton Grove Road.

Events

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Download Acrobat Reader Download Flash Player Download QuickTime Download Windows Media Player Download Microsoft Silverlight Download Word Mobile App Download Excel Viewer Download PowerPoint Viewer
Last updated: 9/1/2015 8:39:04 AM